Search Results
   

DIGITAL SOLUTIONS TECHNOLOGY

Process Safety Management (PSM) Services

 Home of the Mach II Digital Engineer 

  
  • HOME
  • PSM Project Manag. Plan
    • PSM Project Execution
    • PSM Monitor & Control
  • PSM Audit
    • Process Safety Informatio
    • Process Hazard Analysis
    • Operating Procedures
    • Employee Training
    • Contractor Training
    • Pre-Startup Safety Review
    • Mechanical Integrity
    • Hot Work Permit
    • Management of Change
    • Incident Investigation
    • Emergency Preparedness
    • OSHA Compliance Audit
    • No Trade Secrets
  • DIERS
    • Problem Definition
    • Basic Data
    • System& Opr. Data
    • Scenario
    • Basic Data Fire
    • Basic Data- Other
    • Piping Date I /O
    • Specificaation Sheet
  • Single-phase Fire Report
  • Two-phase Test I/ O
    • Two-phase Test II
  • Two-phase Fire Relief
    • Two-phase Fire Results
  • Max Flux(Gmax) System
    • Max Flux(Gmax)-Main
    • Max Flux(Gmax)-Vessel
    • Two-phase Piping
    • Gmax -Nozzle
    • Gmax-Outlet Pipe
  • Two-phase Report Nozzle
    • Two-phase-Piping I
    • Two-phase-Piping II
    • Two-phase Graphics
  • Coupling Equation
    • Coupling Equation Results
    • Coupling Equ. Churn-turbu
    • Coupling Results Churn
  • Runaway Reaction
    • Runaway Reaction-Results
  • DIERS Benchmarks
    • Simpson Nozzle Results
    • Simpson Pipe Turbulent
    • Pipe Turbulent Results
    • Pipe Laminar Results I
    • Benchmark Basic Data
    • 1 Vapor Flow Report
    • 1Vapor Flow Two-phase Eng
    • 2, 4 Two-phase Flashing
    • 3 & 5 Two-phase Hybrid
    • 6 Churn-turbulent
    • 7 Homogeneous Case
    • 8 Liquid Water
    • 8 Liquid Water Two-phase
    • 9 High Viscosity Water
    • 10 Frozen Flow
    • 11 High Viscosity Frozen
  • Guidelines & Procedures I
    • Design Approach
    • OSHA & ASME Code
    • API Storage Tanks
    • Set Pressure
    • Relief Types & Selection
    • Installation & Maint.
    • Capacity Calculations
    • Orifice Size & Pres. drop
  • Project Management
    • Project Integration Mang.
    • Project Scope Management
    • Project Schedule
    • Project Cost Mang.
    • Project Quality Mang.
    • Project Resource Mang.
    • Project Communication Man
    • Project Risk Management
    • Project Procurement Mang.
    • Project Stake-holder Man.
    • List of Knowledge Skills
    • Cross-Cutting Knowledge
  • Company Brochures
    • AIChE Mach II Brochure
    • Regression Tool Brochure
    • PSM Report Brochure
    • 12 REasons Brochure
    • Tri-Fold Front
    • Tri-Fold Front-Copy
  • Info page
  • PSM Report Engine
  • All steps
  • Max Flux(Gmax)-Main III
  • Runaway Reaction III
  • Cross-Cutting Knowledge-Copy